AuthorMessages
Peter CareyUser is Offline
Veteran Member
Veteran Member
Posts:2829

--
12 Dec 2006 08:36 PM  
Here are some pictures from the install process back a couple weeks.  Sorry it took a while to get the pictures up.

Engine Install Phase 1

Thanks again to all that attended.  I hope I wasn't too much of a job pusher and I think everyone had a good time.   Was the goal accomplished?  not 100%.  Does that really matter?  no.  We got a lot of work done I couldn't have done myself and I appreciate it.

Thanks to Chris for taking the camera and getting some shots while I was preoccupied.
Chris RollinsUser is Offline
Advanced Member
Advanced Member
Posts:507

--
14 Dec 2006 01:00 PM  
I had a heck of a time Peter, whens the next go round?
Peter CareyUser is Offline
Veteran Member
Veteran Member
Posts:2829

--
14 Dec 2006 02:30 PM  
Waiting on for sures from Dan and Isaac. I'd like to pick Jan 12/13.

Here's the list of stuff to do, more or less
Left to do before engine starts:
- Attach torque converter bolts
- Install transfer case and mounts
- Attach fuel lines to pump and return nozzle
- Relocate powersteering pump and attach hoses
- Afix fuel filter to body
- Attach coolant resevoir to body
- Figure out wiring and hook up needed things
- Purchase new gauges for boost and exhaust temp
- Install EGT and boost gauges
- Reattach bumper
- Drill out old bolts and reattach winch
- Hook up air hoses
- Hook up cooling hoses
- Install batteries
- Install Hellroaring isolator(s)
- Install radiator
- Install AC cooling stuff
- Install transmission cooler
- Remove old AC pulley and install new one
- Router shifter calbe properly
- Top off transission and transfer fluids

Left to do before 'done':
- Install grill
- Inflate tires
- Check fluids
- Attach parking break
- Attach drive shafts
- Insulate flooring
- Reattach carpet inside
- Attach transfer case shifter works
- Pretty up shifterness
- Insulate hood
- Attach hood
- Tighten up snorkel
- Wire all warning lights properly
- Buy new tabs
Peter CareyUser is Offline
Veteran Member
Veteran Member
Posts:2829

--
14 Dec 2006 03:15 PM  
Ok, it's officially the 5th and 6th of January. letme know if you want to make it
Chris RollinsUser is Offline
Advanced Member
Advanced Member
Posts:507

--
14 Dec 2006 03:28 PM  
count me in
Andy BerglundUser is Offline
Tacoma, WA
Veteran Member
Veteran Member
Posts:3453

--
14 Dec 2006 03:36 PM  
pics came out good. the best one is with everyone standing around staring at whatever's on the floor
Dan CroninUser is Offline
Veteran Member
Veteran Member
Posts:2846

--
18 Dec 2006 10:13 AM  
Gas tank
Peter CareyUser is Offline
Veteran Member
Veteran Member
Posts:2829

--
18 Dec 2006 11:51 AM  

Which is now properly labeled a *fuel* tank.

gas, gas, yicky, yicky

You are not authorized to post a reply.

Active Forums 4.1
NOT LICENSED FOR PRODUCTION USE
www.activemodules.com
Copyright (C) 2010 Northwest Overland Society, LLC   Terms Of Use  Privacy Statement